Demonstration Sites

Technological Innovations

An innovative piping system for TEMPO
An innovative piping system for TEMPO

Within TEMPO, the demonstration project for a new built urban network is in the design phase and several options for the best configuration of a 4-line system have been investigated. The task is to deliver heating, cooling and domestic hot water to row houses and apartment blocks from renewable sources, based on geothermal with HeatPump

Network Optimisation – Digitalisation
Network Optimisation – Digitalisation

  • A supervision ICT platform for detection and diagnosis of faults in DH substations
  • Visualisation tools for expert and non-expert users
  • Smart DH network controller to balance supply and demand and minimise return temperature (i.e. STORM controller)

Individual Building Optimisation
Individual Building Optimisation

  • Optimisation of the building installation
  • Decentralised buffers at the consumer side

Latest News

Report on the Integrated Innovations in A2A network
Report on the Integrated Innovations in A2A network

In February 2020 the very first report on the results of the integrated innovations in A2A network is finally available. TEMPO project is fully operative and it's time to take stock of the implementation status of the solution packages. The document...

Great success for the first TEMPO workshop
Great success for the first TEMPO workshop

Hundred people gathered in Brescia to debate about the role...

13 Nov 2019
TEMPO workshop ‘New digital solutions for lower temperatures’
TEMPO workshop ‘New digital solutions for lower temperatures’

It's time for the first TEMPO technical workshop dedicated to...

22 Oct 2019
Pipe Sizing for Novel Heat Distribution Technology
Pipe Sizing for Novel Heat Distribution Technology

The very first scientific article from TEMPO research is now...

04 May 2019